Moscow/Russia
Posts: 2 since Sep 2013
Thanks Given: 0
Thanks Received: 0
|
Hello to all
I have an idea to draw on NT7 charts from another application. I mean that I develop an application in Visual Studio, connect it to NT7 and draw something on NT7 charts from my application.
The other idea is to build Time and Sales, which keeps historical trades when the instrument changed.
I know that I can do these via NT7 scripts and attach them to its charts, but I have several charts and do not want to attach my scripts to all of them.
My problem is that I do not know how to connect my application to NT7.
Please, show me some code or give the links to thread which can help me.
Regards.
|